English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
IRE - Sidebar - IRE 2025 Spanish _ 11.21.24
SRS - Sidebar Ad (En Espanol Page) - Roof Hub
RCS - Sidebar - L&L contest
Georgia-Pacific - Sidebar Ad - HD ISO
Project Map It - Sidebar Ad - Close More Roofing Jobs With Project Map It
Duro-Last New Membrane Colors Sidebar ad
English
English
Español
Français

Charleston Civic Center Shines After Renovation

MCA Charleston Civic Center
July 23, 2023 at 6:00 p.m.

The renovation and expansion of the Charleston Coliseum and Convention Center gives new life and an exciting bold look to the city. 

The Metal Contractors Association (MCA) recently shared a case study on the gorgeous, modern renovation work that was done to the Charleston Civic Center. The expansion and renovation work were completed by a talented team of contractors from BBL Carlton using the manufactured MCM panels by S Schaffner Heaney. Together, they created a stunning project that brings a sustainable and iconic element to the Charleston landmark. Here are the details:  

Case study 

The design of the expansion and renovation of the Charleston Civic Center was inspired by the story of West Virginia. Defined by a rugged landscape, the early history of the state was dominated by extractive industries: salt, coal, timber and trapping. This set the local character. With a foundation rich in resources, manufacturing added value to the raw materials, with crafts like glassmaking and industries like chemicals and energy. This attracted a rich diversity of immigrants and a culture of craftsmanship that set the urban character. The economy is shifting from industry and service to information and technology. Again, the landscape and industry that shaped the region gives Charleston real advantages to exploit. The Creative Class, critical for the information and technology age, can live and work anywhere — what they want is access to the outdoors, real places with real character, and continuous education and entertainment. 

Our design started with an organizational concept inspired by this history. The Kanawha River is the social organizing link throughout the region, with settlement zones developing on whatever flatland the river provided, creating nodes of activities among the hills and valleys. The renovated Civic Center is a building that emerges from this iconic landscape, with the architecture and topography working together. The Civic Center also has distinct active nodes to celebrate each activity; arena, convention and banquet. These nodes are connected like the hills and cut-rock faces that are seen throughout the state, as people work to connect to each other through the landscape. 

The first critical design objective was to create separate entries and identities for the arena and convention center. This allowed for simultaneous events and clarity of use. For the Convention Center to thrive, it needed a real ballroom assembly space. Located overlooking the Elk River, the new ballroom pre-function space is the most dramatic feature of the center. Together, the three glass-enclosed nodes — arena lobby, convention lobby and ballroom — define a unique Charleston event campus. As described above, the spaces that connect these nodes are inspired by the hills and cut-rock faces that connect the towns along the Kanawha River. With the building emerging from the landscape and expressed as cut-rock walls, the connecting areas were designed to be expressive and economical backdrops to the glass-boxed nodes. 

While the expansion transformed the southeast to the middle of the northern zone of the site, the existing building mass still dominates a portion of the northern and eastern campus. The dominant expression along these existing façades is the landscaped berms. As we imagined the new building expression emerging from the landscape, a strategy developed to transform these berms to reflect, at the pedestrian level, the overall design theme. Above the level of the berms, the new concourse level windows open the façade and provide a much-needed break in the massing. The upper part of the arena is painted in two tones to match the new building, playing off the different faces. The north, south, east and west faces are painted a lighter shade; and the northeast, southeast, southwest and northwest face a darker shade. Dramatic exterior color-changing lighting on the northeast, southeast, southwest and northwest faces transform the look and feel of the center into a fun and festive landmark. 

Project details 

Location: 200 Civic Center Drive, Charleston, WV 

Building owner:  City of Charleston 

Contractor: BBL Carlton 

Manufacturer: Shaffner Heaney Associates, Alucoil North America 

Project budget:  $110,377,046.87 

Size: 283,000 square feet

Date completed: October 17, 2018 

Original article source: MCA 

Learn more about Metal Construction Association (MCA) in their Coffee Shop Directory or visit www.metalconstruction.org.

About the Metal Construction Association

The Metal Construction Association brings together a diverse industry for the purpose of expanding the use of metal in construction through marketing, research, technology and education. Companies involved in MCA gain tremendous benefit from association activities that focus on research, codes and standards, market development and technical programs. MCA’s market development efforts increase the use of metal materials in construction through the education of the building and design communities about the benefits of metal. For more, visit www.metalconstruction.org.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Instant Roofer - Sidebar Ad - Free & Exclusive Roofing Leads
GCMC-Podcast-WinTraining-Sidebar-2
ServiceCon - Sidebar - Sep
Quarrix - Sidebar - ProTect - Dec
Wil-Mar - Sidebar Ad - Pipe Collar
Renoworks - Side Bar Ad - 30 day free trial