English
English
Español
Français

User Access


Instant Roofer - Sidebar Ad - Free & Exclusive Roofing Leads
Owens Corning - Sidebar - Roofle + OC - June
CT_CimateFlex_Infographic_FINAL_2.jpg
Readyslate Sidebar Ad
Maven Group SIdebar Ad
Georgia-Pacific - Sidebar Ad - HD ISO
Duro-Last New Membrane Colors Sidebar ad
English
English
Español
Français

Question.

« Back To Roofers Talk
Author
Posts
September 10, 2010 at 11:42 a.m.

FL Roofer

Which would you say is the fastest method of running three tabs? Racking- forty five accross the roof, or column, up to the ridge and back down.

September 11, 2010 at 6:21 p.m.

robert

When i arrived in Florida in 1989 i had been running 3 tabs on 5 for years and hand nailing,i was introduced to senco staple guns and a lot of line popping there.I found it was faster to go up a rack with a staple gun or coil nailer and it was all about speed back then.We were getting paid very low and had a lot of metal to hang and bull to smear.

September 11, 2010 at 7:30 a.m.

TomB

$5 degrees.....Waaaayyyyy quicker/efficient


« Back To Roofers Talk
You must be logged in to reply to this topic.

CentralStates-MetalRoofing5.3Billion-Banner
English
English
Español
Français

User Access


Instant Roofer - Sidebar Ad - Free & Exclusive Roofing Leads
Bitec - StrongHold Sidebar Ad
Contractor Outlook - Sponsored by SRS
CT_CimateFlex_Infographic_FINAL_2.jpg
Wil-Mar - Sidebar Ad - Pipe Collar
Cougar Paws - Sidebar Ad - The Tool You Wear Gif
Readyslate Sidebar Ad