By Roof Hugger.
When working with customers on retrofit projects, it’s important to check in with them about the other options they may be exploring. Often, they will be interested in TPO overlays, as they tend to be priced lower, which may be appealing to them. But informing customers on the benefits of going with metal-over-metal retrofits instead can show them the value and worth of choosing TPO overlay. Roof Hugger has put together this guide of major talking points to share with customers.
This is important, an independent study conducted for the Metal Construction Association (MCA) has shown that the expected service life of unpainted zinc aluminum coated, standing seam roofs (galvalume or equal) have a projected minimum service life of 60 years and a second study by the National Coil Coaters Association (NCCA) showed a projected minimum service life of 40 years for a painted PVDF roof. The expected service life for mechanically attached TPO is 18-24 years. This means that your metal-over-metal roof proposal will have almost three times the life of the nearest competitor for a 20%-25% greater investment.
Promoters of TPO love to taut that they can meet the new higher wind loads. The reality is, yes, certain specific assemblies can meet the wind uplift requirements of the building code. That said many assemblies being proposed by contractors are designed based on attaching to the existing roof deck. Metal building roofs cannot be considered as decking. Decking is 22 gauge structural, heavily corrugated metal panels. Structural metal building roof panels are typically 26 or 24 gauge, mildly corrugated panels with completely different structural properties than structural steel decking. A properly attached TPO system must be attached to the structural purlins of the building. Most metal buildings have 5’ o.c. purlin spacings but many TPO systems attach their material 10’ o.c. skipping one purlin line! Good engineering practice never allows the skipping of any structural elements in a building, especially a purlin line. Be sure to find out what assembly they are proposing to use, look it up and read about its limitations. An easy place to do this is on the Florida Product Approval website where all the various assemblies are listed along with their attachment requirements, capacities and limitation of use.
If you are in a snow load area, TPO’s can have a rough time here. The new building codes frequently have increased the ground snow load minimums and now require the building be checked for “drift loading” or “Unbalanced loading” caused by the wind stacking snow on the roof in an uneven fashion. The major components of TPO systems are foam insulation and a 40-60 mil thick sheet membrane. None of these components are structural members and they rely on the existing, often deteriorated, old metal roof to support them. Often when an analysis of the old metal roof is done it is found that the old metal roof cannot meet the current snow load requirements on the existing purlin spacing. This means that for the old roof to meet the building code, framing must be added to reduce the purlin spacing, not easily done beneath the existing roof. Therefore, this code requirement is frequently ignored by the single-ply contractors, not Roof Hugger.
There is one constant when it comes to metal building design. Metal roofs are never designed to have water standing on them. Metal building purlins are thin, lightweight Zee’s and are allowed to be designed with much more deflection than the typical conventional roof constructed with heavy bar joist and metal decking. Metal Buildings can do this because metal roof panels have ribs spaced from 12” -24” that channel the water from the ridge to the eave quickly and evenly; the water does not stand on the roof. Too often metal buildings modified by single-ply contractors have filled parapet gutters with foam to fix a gutter problem and then installed scuppers through the parapet to let the water run out. The problem with this is that water must build up behind the parapet and then flow to the scuppers, stacking water on a roof that was never designed for this. The result can be catastrophic.
There are many other considerations to be reviewed when comparing a metal roof retrofit to a TPO retrofit. They include:
A new metal roof may be a bit more expensive, but it is the best, longest lasting product in the marketplace today. It can meet all the new wind, snow and insulation requirements, yes, the best costs a little bit more but it is well worth it.
Original article source: Roof Hugger
Learn more about Roof Hugger in their Coffee Shop Directory or visit www.roofhugger.com.
About Roof Hugger
Roof Hugger, LLC, headquartered in Lutz, Florida, is the creator of the Roof Hugger sub-purlin system that provides the industry’s most effective way of installing a new metal roof over an existing metal roof. The system is structurally correct, non-disruptive and cost effective. It adds strength, is environmentally friendly, and conserves energy. Roof Hugger is a member company of the LSI Group, Inc. of Logansport, Indiana. For more information visit www.roofhugger.com
Comments
Leave a Reply
Have an account? Login to leave a comment!
Sign In